Patching Golden’s Streets

As a result of the severe weather over the past few weeks, the city hired an asphalt contractor to begin patching damage The long-term patches require hot mix asphalt, but because it’s not available this time of year we rely on cold mix patches to tide us over until the spring. City crews have been cutting ice, opening drainages for melting snow, plowing, and then starting to do the pothole work. The freeze-thaw temperatures we’ve been having (although not during this sub-freezing spell, of course) is perfect pothole-creation weather.

To report potholes please call Ron Reavis at 303-384-8155.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: